Lancaster University
Case StudyA little refurbishment work at Lancaster University for the new Deli carried out a deep clean on the equipment, colour matching of the existing cassette fascias and re-installing the interconnecting services to match the new exposed look and Deli layout.
Read MoreRoyal Preston Hospital
NewsNew Daikin chiller in position on the roof at Royal Preston Hospital. Thanks to AE Engineering for the early morning crane lift and Gary and Sam for positioning it ready for the mechanical installation.
Read MoreEvans Vanodine, Preston
NewsEvans Vanodine in Preston has finished their office and laboratories extension and refurbishment.
Read MoreAllcool Undertakes New Installation at Fleetwood Football Club’s New Training Ground
NewsAllcool (NW) Limited are very pleased and proud to have undertaken a complete new installation of air conditioning and cellar cooling equipment at Fleetwood Football Club's new training ground complex in Thornton.
Read MoreThe Grand at Grasmere Cumbria – Country House Hotel
NewsIn November and December 2015 The Grand at Grasmere, Cumbria in the Lake District carried out a complete refurbishment of the ground floor of the hotel and Allcool (NW) Limited were appointed to supply and install the air conditioning equipment to the dining room. We installed a VRF system connected to 7 Mitsubishi Zen wall mounted units in silver linked to an AE200 touch screen controller for future expansion.
Read MoreAllcool Commence Work on a New Unit on Whitehills Industrial Estate in Blackpool for DJ Bailey Electrical
NewsAllcool (NW) Ltd have been commissioned to supply and install a number of split type air conditioning equipment to the "new build" offices on Whitehills Industrial Estate in Blackpool on behalf of Bailey Group.
Read MoreAir Conditioning and Refrigeration Maintenance Contracts for Educational Institutions
NewsIn line with recent changes to legislation, most academic institutions including, academies, colleges and universities are now responsible for their own finance and budgets when it comes to the air conditioning and refrigeration servicing, repair and maintenance within these institutions.
Read MoreReplacement Air Conditioning Equipment Installed at Coral Island
NewsThe existing air conditioning units were all pumped down and de-gassed and safely disposed of in compliance with the F- Gas regulations. The interconnecting pipework and services were retained and we flushed the copper tube with a solution to remove any residual oil that may have been contaminated.
Read MoreAFC Fylde’s New Stadium at Mill Farm Sports Village Wesham Preston
NewsAllcool have recently installed two cellar cooling systems at AFC Fylde's new state of the art 6000 seater stadium. In Bradley's Cellar a J & E Hall JCC 60E system has been installed whilst in the away supporters' cellar a J & E Hall JCC 40E system has been installed.
Read MoreDaikin Cassette units installed into Kirkgate House – Blackpool Business Park
NewsAllcool (NW) Ltd working under instruction from AC Electrical, recently installed 10 X 10KW Daikin cassette style air conditioning systems along with two heat recovery fresh air system's into Kirkgate House on the Blackpool Business Park off Squires Gate.
Read MoreTop Safety Accreditation for Allcool (NW) Limited
NewsLocal business Allcool (NW) Ltd has been awarded accreditation from Safecontractor for its commitment to achieving excellence in health and safety.
Read More